Théâtre Alphonse-Desjardins |Repentigny

The expected from the North Shore

 

Project description

Go Multimedia was mandated by the City of Repentigny to design a hybrid performance hall within its Cultural Space. Its three configurations, fixed seats (Italian style), cabaret or standing, allow the holding of popular amplified shows, corporate events with reception tables, musical productions, but also classical music concerts. After having been awaited for several decades in its community, the hall was finally able to open in the spring of 2021. Its design and construction, as well as its acoustic shell, give it a rare acoustic quality, among the most exceptional in the country. We are happy that the result is up to par.

Photo credit : Les architectes fabg

Informations

CLIENT: Ville de Repentigny
DATE : April 2021
OVERALL CONSTRUCTION : 19 M$

Our implication

Involved from the start of the project, our team provided complete scenographic work, affecting the hall as well as the foyer, dressing rooms and technical spaces. We provided cutting-edge technical assistance to professionals, to the broadcaster and its technical team, and of course to the City of Repentigny. After having designed and specified the lifting and covering system, the acoustic shell and the multimedia systems, we ensured the proper completion of the project and the implementation of our prescriptions, until the opening show.

Photo credit : Patrick Beaudry, SNAPePHOTO

Some highlights

Retractable bleacher system
Motorized forwarders
Touch control of the motorization
Movable acoustic shell
A network of digital multimedia connections
Fully LED scenographic lighting
DCI cinema projector

Photo credit : Patrick Beaudry, SNAPePHOTO