Auditorium de la Polyvalence Montignac | Lac-Mégantic

Project Description

The auditorium of Polyvalente Montignac appears in a new light. This renovation, so much desired by the Haut-Cantons School Commission (CSHC) and the Megantic Cultural Committee, has finally been able to give back to the public the primary function of this room. Thanks to the renewal and improvement of the seating arrangement in the auditorium, the change of the stage floor surmounted by a real stage frame, the installation of a real motorized stage elevation system and the integration of a new F.O.H. walkway. This radical change quickly became apparent to the first visitors and spectators who visited the auditorium.

Information

CLIENT: Comité Culturel Mégantic
DATE : 2018
CONSTRUCTION COST: 430 000$