Our involvement as a scenographic and multimedia expert for the construction of the new Colisée de Trois-Rivières was to establish the technical prescriptions and parameters necessary for the writing of the technical specifications used in the call for tenders and to ensure that the requirements established in the program were respected during construction.  The amphitheatre will have two LED rings around the rink and a technical ceiling that can accommodate the performance infrastructure.

The new Coliseum should be ready by the end of 2019 and will be located in District 55.

Article on the Radio-Canada website